12/28/2016

The Influence of Different Impeller Structure on the Performance of Sewage Pump


1) The closed blade impeller designed according to the clear water pump has the highest efficiency, but because of the large number of blades, the blade is distorted, and the impeller exit width is narrow, so it is easy to produce winding and clogging when pumping sewage dirt, And it is prone to overload, it is generally not in engineering practice.
 
2) According to the design of the sewage pump closed impeller blade number is relatively small, generally 2-3, the impeller exit width is larger.The blade is cylindrical, and the blade head column diameter larger. Thicker, and thus has a certain anti-winding, anti-clogging performance, in a long period of time before the often used for various types of sewage pump impeller, but the efficiency is relatively low and there is danger of overload.
 
3) The width of the double channel impeller is larger than the maximum value of the maximum diameter of the solid particle in the standard.It is two curved flow passages from the inlet to the outlet, so it is anti-entangling and non-clogging. .
 
4) The efficiency of the dual-channel impeller is high, and the efficiency of the rated working point pump is 13.04% higher than the specified value of CJ / T3038-1995 standard.
 
5) The power curve of the dual-channel impeller is relatively flat, and the maximum shaft power is far less than the rated power in the whole head range from zero head to the dead head without overload performance and safe operation in the whole lift range.
 


6) As the flow channel impeller has obvious advantages, so the use of flow-type impeller instead of the usual sewage pump design used in the closed blade impeller is a development trend. In addition, from the anti-winding, non-clogging performance, through the ability, efficiency, process, economy, reliability, advanced integrated analysis and comparison of flow impeller is also better than several other impeller structure type, which has A strong promotion and application value.

12/13/2016

Water isolation and oil recovery technology of Oil filled submersible electric pump

Water isolation and oil recovery technology of Oil filled submersible electric pump

Trouble shooting method for hot water submersible pump

Trouble shooting method for hot water submersible pump

Maintenance knowledge of self - priming pump

Maintenance knowledge of self - priming pump

Submersible sewage pump type and cutting type has the advantages of contrast

Submersible sewage pump type and cutting type has the advantages of contrast

Non-negative pressure water supply equipment working principle and its advantages

Non-negative pressure water supply equipment working principle and its advantages

Mistakes in the use of centrifugal pump

Mistakes in the use of centrifugal pump

Discussion on Flow Control of Centrifugal Pump

Discussion on Flow Control of Centrifugal Pump

Disables maintenance of the pump

Disables maintenance of the pump

12/04/2016

Maintenance of submersible sewage pump

Submersible sewage pump has many advantages, it is now submersible pump products in the domestic demand has increased year by year, how to repair submersible sewage pump it?
1, the sewage pump should be someone to manage and use, and regularly check the electric pump winding and the insulation resistance between the chassis is normal.


2, each time, especially for thicker than the viscous medium, the pump should be run into the water for a few minutes to prevent sediment retention pump to ensure that the sewage submersible sewage pump clean.
3. Under normal conditions, the sewage pump should be filled or replaced with oil (oil No. 10-30) after every 300-500 hours to keep the mechanical seal in good lubrication condition and improve the service life of mechanical seal.
4. Non-clogging submersible sewage pump If the pump should not be removed from the water when not in use for a long time, do not soak in water for a long time to reduce the chance of damp motor stator windings to increase the pump life can be sprayed paint to the paint off place, So as not to rust.
5. Replace the seal ring: the long-term use in the sewage medium, the impeller and seal ring clearance between the gap may increase, resulting in reduced pump flow and efficiency, should turn off the gate, the pump lift, remove the bottom cover, remove Seal ring, according to the actual size of impeller ring with seal ring, the gap is generally about 0.5mm.
6. Submersible no clogging Sewage pump disassembly, maintenance, chassis components must be 0.2MPa airtight test to ensure that the motor seal reliable detection of water pumps should adopt the click approach to ensure that the product is normal and then start the motor.
7, small-scale sewage pump can be used mobile installation, the diameter of more than 100mm submersible sewage pump is recommended to use coupling installation for future maintenance and testing.

12/01/2016

Regulating valve installation and use matters needing attention

More pump knowledge please enter:http://www.wel-pumps.com
The new control system design and installation, in order to ensure that the valves in driving to work, and make the system safe operation, before installing the new valve should first check whether the valve on the nameplate labeled with the design requirements. At the same time also to deal with the following items for debugging.

Basic error limit; total travel deviation; return difference; dead zone; leakage (in the strict requirements of occasions).

If the original system is to overhaul the valve, in addition to the above for calibration, but also to deal with the old valve stuffing box and connection and other parts of the seal.

In field use, many are not because of quality control valve itself is caused by, but the valve caused by improper installation, such as the installation environment, or improper installation location and direction of pipe is dirty due to other reasons. Therefore, the installation and use of electric control valve should pay attention to the following aspects:

The regulating valve belongs to field instruments, requirements of environmental temperature should be at - 25 to 60 DEG C, relative humidity is less than 95%. If it is installed in the open air or high temperature, should be taken to water, cooling measures. In a place away from the local oscillator source or increase the anti vibration measures.

The valve should be installed vertically, can be tilted under special circumstances, such as the tilt angle is large or the valve itself is too large weight bearing parts of the valve should be increased protection.

The installation of the pipeline control valve is generally not too high off the ground or floor, the pipe height is greater than 2m should be possible to set a platform to facilitate the operation of wheel and easy maintenance.

The valve piping should be cleaned before installation, remove dirt and welding slag. After installation, in order to ensure that impurities remain in the body, but also should be cleaned again, that is, through the media should make all the valve open, so as to avoid impurities stuck. After using the hand wheel, should be restored to its original neutral position.

In order to make the valve in the event of failure or maintenance of the case so that the production process can continue, bypass valve should be added to the pipeline.

At the same time also should pay special attention to the installation location of the regulator valve is in line with the requirements of the process.

No electrical part of the electric control valve should be installed according to the construction requirements for electrical equipment. If it is an explosion - proof products should be according to the "explosion hazardous areas of electrical equipment installation specification" requirements for installation. If the wire by SBH or other six or eight core, diameter of about 11.3mm?? rubber cable installation. In the use of maintenance, in the explosive site is strictly prohibited through the open cover maintenance and to pry open the surface to play. At the same time and do not knock or scratch injury flameproof surface, after overhaul to restore the original state of explosion-proof requirements.

Is the executive body of the reducer overhaul should be noted that after lubrication, low-speed motor is generally not washable. Assembly should also check the valve position and valve position indication is consistent.